|
CPL Coverage Is Available Either: |
Excluding Mold |
Including Mold |
Or Limited Only to Mold |
|
With the lowest
minimum premiums in the industry, competitive rates/commissions
and A+ XV paper, NECC is the only CPL market you will need for
almost any type of contracting risk. |
|
Examples of Recently Written CPL
Risks: |
$1mm Occurrence Form CPL and $1mm Claims Made Mold CPL for a
large drywall and plastering contractor. |
|
Premium: $27,988 |
$2mm project specific CPL including mold covering the
installation of a fire suppression system at a hospital.
|
|
Premium: $6,000 |
$1mm Occurrence Form CPL for a weatherization contractor.
|
|
Premium: $2,500 |
$1mm CPL including Mold for a fire and water restoration
contractor. |
|
Premium: $4,000 |
$1mm Occurrence Form CPL and $100,000 Claims Made Mold CPL for a
firestop and caulking contractor. |
|
Premium: $5,255 |
$1mm CPL including mold for a contractor performing mold
remediation, lead paint remediation and air duct cleaning. |
|
Premium: $6,000 |
$1mm Occurrence Form CPL increased to $5mm for one project for a
concrete construction and painting contractor. |
|
Premium: $11,000 (including the
project increase) |
$1mm project specific Occurrence Form CPL covering a job
involving the installation of water piping. |
|
Premium: $2,670 |
|
·
$1mm Occurrence Form CPL for an industrial
refrigeration contractor. |
|
Premium: $11,897 |